![]() ![]() Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains. ![]() Heating, Ventilating, and Air Conditioning (HVAC).Ĭommunications, Data Communications, Voice Communications, Audio-Video Systems.Įxterior Improvements, Fences and Gates, Turf and Grasses. Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties. The content management team will continue to pursue additional details as they become available. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. A CIP is a financial schedule for short- and long-range projects which is updated regularly. *Project information has been obtained through a public capital improvement plan (CIP). As of November 23, 2022, further details regarding design and construction have not been identified. The project is included in the city's 2023-2027 capital improvement plan (CIP). This project will rehabilitate the aging lift station that will involve the recoating of the wet well with a coat lining, replace the piping and pumps, upgrade the electrical control panel and a manual transfer switch. Veterans 2 Regional Lift Station Capacity Expansion & Rehabilitation - WW2302 - City of Pearland New Construction, Infrastructure - 10,640 SFīuffalo Wild Wings - 9005 Broadway Street - Pearland, TX ![]() HPW - Lift Station Renewal And Replacement Manvel Town Center Water Line Interconnect RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract 4 in Brazoria County, Freeportĭemolition, New Construction, InfrastructureĬonstruction of Beechwood Chemical Building New Construction, Infrastructure - 7,125 SFįreeport Harbor Channel Improvement Project, Texas, Reach No. New Construction, Infrastructure - 4,767 SF The Landing at Pearland Clubhouse and Amenities Sanitary Sewer Rehabilitation - Barry Rose Service Area (BR-04) - WW2301 - City of Pearland Centennial Water Park Lift Station - WW2307 - City of Pearland ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |